Post-Construction Cleaning: The Step-by-Step Pro Method

 


(How to Turn a Dusty Construction Zone into a Spotless Space – Contractors Won’t Tell You These Tricks!)

Why Post-Construction Cleaning is Different

After renovations, you’re not dealing with ordinary dirt but:
⚠️ Microscopic silica dust (hazardous when inhaled)
⚠️ Adhesive residues (from flooring/tiles)
⚠️ Paint overspray (on windows, fixtures)
⚠️ Drywall dust (clogs HVAC systems)

This proven 3-phase system is used by cleaning companies charging $300-$800 per job.

PHASE 1: DUST ARMAGEDDON (Days 1-2)

Tools You’ll Need:

  • HEPA-filter vacuum ($200+ investment, but critical)

  • Microfiber mop with telescopic pole

  • Magnet dust mop (for ceilings/walls)

  • Air scrubber (rent for $50/day)

Step-by-Step:

  1. Ceilings First

    • Use an extendable duster on fan blades, ducts, and light fixtures

    • Pro Trick: Wrap HVAC vents with cheesecloth to prevent recirculation

  2. Walls & Windows

    • Wipe down with tack cloth (sticky cheesecloth for fine dust)

    • For paint spots: Razor blade + glass cleaner

  3. Floors

    • NEVER sweep dry dust (spreads particles)

    • Vacuum with HEPA filter, then damp mop

PHASE 2: HARD SURFACE DECONTAMINATION (Day 3)

Problem Areas & Solutions:

SurfaceChallengeSolution
HardwoodGypsum dust in groovesTSP rinse (1/4 cup per gallon)
TileGrout hazeNylon brush + sulfamic acid
CountertopsSilicone residueRubbing alcohol + plastic scraper

Pro Tip:

For stubborn adhesive (vinyl flooring, stickers):

  • Heat with a hair dryer for 30 seconds

  • Peel with a putty knife

  • Remove residue with Goo Gone

PHASE 3: FINAL TOUCHES (Day 4)

Last Steps Before Inspection:

  1. HVAC Blowout

    • Replace filters

    • Run the vent vacuum attachment

  2. Final Air Purge

    • Run air scrubbers 48 hours post-cleaning

    • Place bowls of activated charcoal to absorb VOCs

  3. White Glove Test

    • Check:

      • Inside electrical outlets

      • Behind appliances

      • Top of door frames

Pricing Guide (What to Charge)

Job SizeTime RequiredGoing Rate
Single room (bathroom)6-8 hours$250-$400
Whole house (2,000 sq ft)3-5 days$1,200-$2,500
Commercial (office build-out)1-2 weeks$5K-$15K

Upsell Opportunity: Offer "Construction Dust Prevention" pre-cleaning for 20% higher fees.